BETWEEN GENERAL CONTRACTOR FAQ
Answers for the first stage of planning.
These answers help property owners prepare for a specific conversation. Permit and jurisdiction requirements should be confirmed for the actual address.
Who handles permitting for a house in Between — the town or Walton County?
It depends on which side of the municipal boundary the parcel sits on. Inside Between's limits, the town's own planning and permit source is the correct first call, and staff can confirm exactly which reviews or inspections your project triggers. Outside that boundary, Walton County typically takes over as the governing contact. The mailing address alone won't tell you which one applies.
How should I approach exterior changes along US 78?
Start by documenting the existing conditions thoroughly — current photos, a survey, drainage notes, and how the lot meets the road. From there, ask the town directly whether that stretch of US 78 carries any corridor-specific or site-review expectations. A neighboring property or landmark isn't a reliable stand-in for an answer tied to your exact address.
Does living near the Between municipal boundary change anything for a renovation?
It can shift practical details — how crews and materials access the site, where drainage needs to go, staging space, and how visible the finished work is from the road. Proximity to the boundary doesn't decide approval by itself, but it's worth mapping on a site plan and raising directly with whichever office turns out to have jurisdiction.
Is the 30656 ZIP code enough to know who issues my permit?
No. ZIP code boundaries and municipal or county lines frequently don't line up. The parcel's legal description, official GIS data, and direct confirmation from city or county staff are what actually determine jurisdiction — get that settled before any plans are submitted or inspections scheduled.
What should I bring to a first conversation about a project in Between?
Have the address, a survey if one exists, current photos, a rough description of the scope, and any known drainage or utility quirks. Mentioning whether the property sits along US 78, back toward New Hope Church Road, near town center, or close to the municipal boundary helps frame the access and review conversation from the start.
What groundwork should happen before construction actually begins on a Between property?
Confirm any relevant contractor licenses through Georgia's state verification portal, and have Georgia 811 flag utility lines before any digging. Neither step replaces a permit, survey, or engineering review where one is needed, but both are standard, inexpensive groundwork before a crew mobilizes.