GWINNETT COUNTY GENERAL CONTRACTOR FAQ
Answers for the first stage of planning.
These answers help property owners prepare for a specific conversation. Permit and jurisdiction requirements should be confirmed for the actual address.
Which office issues building permits in Gwinnett County?
It depends entirely on where the parcel sits. Gwinnett County Planning and Development issues permits for unincorporated land, while Lawrenceville, Duluth, Suwanee, Snellville, and the county's other cities each run their own building and zoning review. Start with the county's GIS browser, then confirm with whichever office actually has authority before filing anything - the city name on your mail won't answer that question.
My mailing address says Lawrenceville - does that mean I'm in city limits?
Not necessarily. Postal addresses routinely extend well beyond a city's actual boundary, and that holds true for Lawrenceville and the other communities across the county. Look up the parcel in the Gwinnett GIS browser, find the mapped boundary, and call the office it points to for confirmation. A ZIP code or utility bill won't prove it either way.
What should I check before building near I-85 or the Chattahoochee River?
Conditions vary lot to lot, but land along I-85 and near the Chattahoochee River can involve slope, tree cover, drainage paths, mapped buffers, flood data, easements, or utility lines that shape what's buildable and where. Pull official mapping, get a current survey if you don't already have one, and bring in design or engineering help once site conditions warrant it.
How should I start planning an addition near Suwanee Creek Greenway or Duluth?
Confirm jurisdiction and the property boundary first, then get a measured survey or site plan and document what's already standing. Review setbacks, easements, drainage flow, how a new roofline ties into the existing one, foundation approach, and whether utilities can handle the added load. Around Duluth in particular, verify upfront whether the city or Gwinnett County reviews that lot.
What's a fair way to compare contractor bids?
Give every bidder identical drawings, the same finish assumptions, and the same written scope so their numbers are actually comparable. Look beyond the bottom-line price to exclusions, allowances, schedule assumptions, who handles permitting, supervision, payment terms, cleanup, warranty coverage, and how change orders get priced. Verify license status through the Georgia Secretary of State's search and call recent references about how the project actually went.
When does Georgia 811 need to be called before work starts?
Before any equipment touches the ground. Georgia 811 locates utility lines but doesn't replace a boundary survey, septic check, private line locate, or permit review. Deck footings, drainage trenches, fence posts, and additions all disturb soil, so build the required notice period into your schedule instead of treating it as a last-minute step.